Projects

-
 image

Munmorah Power Station

The project involves the removal of a 1400 megawatt coal fired power station including four 350 megawatt steam driven turbo-alternators, two 155 meter high chimney stacks, boiler house, coal handling plant and conveyors and 2.3km of ash lines.

READ MORE
 image

Harbour Control Tower

The Demolition of the landmark Sydney Harbour Control Tower for Barangaroo Delivery Authority, an 87 metre high concrete tower consisting of a reinforced concrete column topped by stainless steel and glass observation and operations areas.

READ MORE
 image

Hamilton Wharves

The demolition and removal of wharf structures including the removal of 18,000m2 of concrete deck and substructure including timber bearers, joist and concrete head stocks, edge beams and the removal of over 1900 piles.

READ MORE
 image

Duck River Bridge

The removal of a redundant 70m single span pipe bridge at the former Clyde Refinery. The bridge was lifted onto a barge, floated down Duck River and landed at the Clyde Refinery wharf using a combination of mobile cranes. The project was awarded the Contract of the Year Under US$1M Award at the 2016 Wold Demolition Awards.

READ MORE
 image

Clyde Refinery

The demolition and removal of all redundant refinery infrastructure at the former Clyde Refinery including refinery process units, plant and pipework, chimney stacks, storage tanks and buildings. A combination of techniques including mechanical demolition, mechanically induced collapses and controlled implosions were employed.

READ MORE
 image

Omega Transmission Tower

Standing 432 metres (1,418 ft) high, the Omega Transmission Tower in Darriman, Victoria was the tallest structure in the Southern Hemisphere until its recent demolition. Contracted by the Department of Defence, Liberty Industrial used controlled explosive techniques to bring down the redundant navigational tower.

READ MORE
 image

Swanbank B Power Station

Liberty Industrial carried out the deconstruction of a 480 megawatt coal fired power station and all structures, plant, equipment and associated infrastructure at the Queensland Government owned Swanbank Power Station site in Ipswich, Queensland.

READ MORE
 image

Port Kembla Coal Stacker R...

The project involved the demolition of a coal Reclaimer and a coal Stacker at Port Kembla Coal Terminal. These machines were removed to allow the installation of new plant as part of a broader PKCT restoration and compliance project.

READ MORE
 image

Hammerhead Crane

Liberty Industrial completed the deconstruction of the historic Hammerhead Crane located at the Garden Island Naval Base for the Department of Defence. The structure was progressively dismantled in large sections in a highly choreographed sequence, engineered to maintain the structural stability of the crane.

READ MORE
 image

HIsmelt Facility

Liberty Industrial carried out the deconstruction of Rio Tinto’s High Intensity Smelting facility in Kwinana, Western Australia. The award winning project was the first of its kind with the project involving the complex dismantling of significant components of industrial plant.

READ MORE
 image

Boodarie HBI Facility

Liberty Industrial was employed to safely demolish and remove a highly complex and challenging facility at the Boodarie Iron Hot Briquetted Iron plant. This high profile landmark facility in the Pilbara region of Western Australia was within our client's top 10 world-wide risks.

READ MORE
 image

Steele Barracks

The demolition of more than 250 buildings across the former Steele Barracks site including the identification and removal of hazardous materials and the removal and disposal of all associated inground infrastructure including existing pavements, hardstands, civil infrastructure and utility services.

READ MORE
 image

IMEX Terminal Early Works

The project involves the early works package for the demolition and land preparation associated with the construction of the Moorebank Intermodal Terminal.

READ MORE
 image

Caltex Townsville Terminal

Liberty Industrial was engaged by Parsons Brinckerhoff for the demolition and remediation of the former Caltex Townsville Terminal site. The project involved the decommissioning, demolition and removal of all redundant fuel terminal infrastructure along with the remediation and reinstatement of the site.

READ MORE
 image

Hay Point Coal Terminal

The project involved the demolition and removal of redundant coal handling infrastructure as part of BMA’s Hay Point Expansion Project at Hay Point Coal Terminal. The project was delivered in confined work areas within a live coal terminal facility amongst operational coal handling plant and infrastructure.

READ MORE
 image

Port Stanvac Refinery

Liberty Industrial was chosen to demolish of the entire Port Stanvac Oil Refinery including the refinery process plant and piping, storage tanks, chimney stack, flare stacks and other associated above ground facilities.

READ MORE
 image

South Byron STP

The South Byron Treatment Plant Project involved the demolition of all above and below ground infrastructure, along with asbestos removal and the remediation of burial pits and sludge drying beds.

READ MORE
 image

Central Precinct Munitions...

The Central Precinct Munitions Factories demolition project involved the demolition of two large munitions factories and ancillary building structures, and the removal and disposal of all inground infrastructure including concrete floors, roads, hard stand areas, footings and services.

READ MORE
 image

Toshiba Warehousing

The project involved the demolition and remediation of Toshiba Australia warehousing and office facilities in Parramatta including car parking and landscaped areas in preparation for residential redevelopment of the site.

READ MORE
 image

Theodore Barcham Asbestos ...

Liberty Industrial carried out the remediation of an 80,000m3 asbestos contaminated site proposed for a new road alignment within Northshore Hamilton Precinct 4B as part of the Northshore Hamilton Urban Development Project; a large waterfront urban renewal project in Brisbane, Queensland.

READ MORE
 image

7 Neil Street Remediation

This remediation project involved the excavation, stockpiling and disposal of over 5000 tonnes of asbestos and hydrocarbon impacted soils along with the dewatering, storage and treatment of in excess of 1 million litres of impacted groundwater.

READ MORE
 image

B48 Liquor Burning Stack

Liberty Industrial carried out the dismantling and removal of the B48 Liquor Burning Stack at Alcoa’s facility in Wagerup, Western Australia.

READ MORE
 image

Cape Lambert Power Station

Liberty Industrial carried out the demolition and removal of the redundant Cape Lambert Power Station for Rio Tinto.

READ MORE
 image

Boodarie Site Cleanup

Liberty Industrial stepped in as the main demolition contractor to assist BHP Billiton Iron Ore after another contractor’s contract was rescinded due to non compliance. Liberty Industrial completed the clean-up works to the satisfaction of BHP Billiton in preparation for the future HBI facility demolition project.

READ MORE
 image

Nelson Point Stacker Recla...

Liberty Industrial was commissioned to demolish and remove a redundant stacker, tripper and Reclaimer 3 at the Nelson Point facility. The task also included the demolition of conveyors, transfer towers, rail lines, and all footings and cyclone tie downs.

READ MORE
 image

Nova Nickel Village

Liberty Industrial was engaged by Kerman to undertake earthworks and civil works for the construction accommodation facilities at Sirius Resources Nova nickel project.

READ MORE
 image

Beneficiation Plant

Liberty Industrial was engaged by BHP Billiton Iron Ore to safely demolish and remove the complex and challenging Beneficiation Plant at Boodarie, Western Australia.

READ MORE
 image

Olympic Dam Bypass Stack

Liberty Industrial was sole sourced for the deconstruction of a failed stack standing within an operating Acid Plant at Olympic Dam mining facility. We were selected on the strength of our reputation as an industrial demolition specialist.

READ MORE
 image

Awaba Colliery

Liberty Industrial was retained to deconstruct and demolish redundant infrastructure at Centennial Coal’s Awaba Colliery in Awaba, NSW.

READ MORE
 image

Nickel West Borsigs Area

Liberty Industrial was chosen to perform a complex demolition and asbestos removal process within an operating facility under extremely stringent conditions and to the highest BHP Billiton safety standards.

READ MORE
 image

Former DNSDC Refuelling Ar...

The project involved the demolition of existing superstructure such as buildings and canopy and the removal of all existing UPSS infrastructure, including all bowser pumps, associated pipework, underground storage tanks with associated fittings and supply lines.

READ MORE
 image

Middle Robe

Liberty Industrial was engaged by Rio Tinto Iron Ore to conduct demolition and rehabilitation works in various locations across 35km of a non operational mine known as Deepdale in Pannawonica, situated 200km South West of Karratha, in Western Australia.

READ MORE
 image

Northern Link Camp

The project involved the demolition and rehabilitation of a 300 person iron ore mine camp located in the Pilbara region, including the demobilisation and dismantling of nominated accommodation units and buildings for transport and shipping to another mine camp.

READ MORE
 image

Clyde Refinery Remediation

Liberty Industrial was engaged to remediate approximately 200 tonnes of heavily impacted bitumen contaminated soil at VIVA Energy’s Clyde facility. Bioremediation was chosen as the treatment method, as it was determined to be the most cost effective and sustainable option.

READ MORE
 image

Bayswater Power Station US...

The project involved the decommissioning of two 20,000 litre and one 30,000 litre Underground Storage Tank at the Bayswater Power Station site in Muswellbrook, NSW. The works were carried out in accordance with the NSW EPA Underground Petroleum Storage Systems Regulation 2014.

READ MORE
 image

Caltex Mareeba Depot

This project involved the demolition and remediation of the former Caltex Depot at Mareeba including the removal of five above storage tanks, the demolition of the amenities, drum store and tanker refuelling gantry.

READ MORE
 image

Newcastle Terminal Demolit...

Liberty Industrial were engaged by Viva Energy on a single source agreement to demolish the former Shell fuel terminal in Hamilton NSW down to grade level and remove all assets from site.

READ MORE
 image

Ballina Asbestos Gravel Re...

Liberty Industrial was engaged by Ballina Shire Council to remediate asbestos contamination at their Waste Management Facility.

READ MORE
 image

Caltex Hamilton Service St...

The project involved the complete site demolition and remediation of a former Caltex Service Station in Hamilton, Queensland. The demolition works includes asbestos removal from the amenities building and asbestos pipework. The demolition also included removal of all hardstand concrete from across the site.

READ MORE
 image

Blackwater Coal Stacker De...

Liberty Industrial carried out the demolition of a collapsed coal stacker at BMA’s Thermal Coal Plant in Blackwater, Queensland. The coal stacker had collapsed during a high wind event and was now hindering BMA’s usual coal export operations.

READ MORE
 image

Tomago Treatment Plant Dem...

The Hunter Water project involved hazardous material removal and demolition of a former Water Treatment Plant at Tomago NSW. The large above concrete structure contained over 3000 tonnes of concrete and brick that required the use of large scale concrete shear attachment due to the heavy reinforcing steel present.

READ MORE