Munmorah Power Station

The project involves the removal of a 1400 megawatt coal fired power station including four 350 megawatt steam driven turbo-alternators, two 155 meter high chimney stacks, boiler house, coal handling plant and conveyors and 2.3km of ash lines.

READ MORE
 image

Sydney Harbour Control Tow...

Liberty Industrial carried out the deconstruction of the landmark Sydney Harbour Control Tower for Barangaroo Delivery Authority.

READ MORE
 image

Hamilton Wharves

The project involved the removal of wharf structures including the removal of 18,000m2 of concrete deck and substructure including timber bearers, joist and concrete head stocks, edge beams and the removal of over 1,900 piles.

READ MORE
 image

Duck River Bridge

The project involved the removal of a redundant 70m single span pipe bridge at the former Clyde Refinery. The bridge had been out of service for some years and required removal due to extensive corrosion and some missing steel members.

READ MORE
 image

Clyde Refinery

The demolition and removal of all redundant refinery infrastructure at the former Clyde Refinery including refinery process units, plant and pipework, chimney stacks, storage tanks and buildings. A combination of techniques including mechanical demolition, mechanically induced collapses and controlled implosions were employed.

READ MORE
 image

Omega Transmission Tower

Standing 432 metres (1,418 ft) high, the Omega Transmission Tower in Darriman, Victoria was the tallest structure in the Southern Hemisphere until its recent demolition. Contracted by the Department of Defence, Liberty Industrial used controlled explosive techniques to bring down the redundant navigational tower.

READ MORE
 image

Swanbank B Power Station

Liberty Industrial carried out the deconstruction of a 480 megawatt coal fired power station and all structures, plant, equipment and associated infrastructure at the Queensland Government owned Swanbank Power Station site in Ipswich, Queensland.

READ MORE
 image

Port Kembla Coal Stacker R...

Liberty Industrial carried out the demolition of a coal stacker and reclaimer at Port Kembla Coal Terminal to make way for new machinery. The works formed part of a broader terminal restoration project.

READ MORE
 image

Hammerhead Crane

The project involved the deconstruction of the historic Hammerhead Crane located at the Garden Island Naval Base for the Department of Defence.

READ MORE
 image

HIsmelt Facility

Liberty Industrial carried out the deconstruction of Rio Tinto’s High Intensity Smelting facility in Kwinana, Western Australia. The award winning project was the first of its kind with the project involving the complex dismantling of significant components of industrial plant.

READ MORE
 image

Boodarie HBI Facility

Liberty Industrial was employed to safely demolish and remove a highly complex and challenging facility at the Boodarie Iron Hot Briquetted Iron plant. This high profile landmark facility in the Pilbara region of Western Australia was within our client's top 10 world-wide risks.

READ MORE
 image

Moorebank Intermodal Termi...

A major piece of transport and logistics infrastructure is being constructed on a former Department of Defence Military School and Logistics Terminal in Moorebank, NSW. The Moorebank Intermodal Terminal is a state significant major project in Western Sydney that will become Australia’s largest Intermodal Terminal.

READ MORE
 image

Moorebank Precinct West De...

The Moorebank Intermodal Terminal is a State Significant major infrastructure project in Western Sydney that will see container freight from the Port of Botany transferred to the site for subsequent loading to trucks in proximity to major transport routes including the M5.

READ MORE
 image

IMEX Terminal Early Works

The IMEX Early Works Demolition and Remediation project (IMEX-EW) was undertaken in Moorebank, NSW, and formed part of the preliminary works associated with the construction of the Moorebank Intermodal Terminal – a state significant infrastructure project.

READ MORE
 image

Caltex Townsville Terminal

Liberty Industrial was engaged by Parsons Brinckerhoff for the demolition and remediation of the former Caltex Townsville Terminal site.

READ MORE
 image

Hay Point Coal Terminal

The project involved the demolition and removal of redundant coal handling infrastructure as part of BMA’s Hay Point Expansion Project at Hay Point Coal Terminal. The project was delivered in confined work areas within a live coal terminal facility amongst operational coal handling plant and infrastructure.

READ MORE
 image

Port Stanvac Refinery

Liberty Industrial was chosen to demolish of the entire Port Stanvac Oil Refinery including the refinery process plant and piping, storage tanks, chimney stack, flare stacks and other associated above ground facilities.

READ MORE
 image

South Byron STP

The South Byron Treatment Plant Project involved the demolition of all above and below ground infrastructure, along with asbestos removal and the remediation of burial pits and sludge drying beds.

READ MORE
 image

Central Precinct Munitions...

Liberty Industrial carried out the Central Precinct Munitions Factories demolition project for Lend Lease. The project involved the demolition of two large munitions factories and ancillary building structures, and the removal and disposal of all inground infrastructure including concrete floors, roads, hard stand areas, footings and services.

READ MORE
 image

Toshiba Warehousing

The project involved the demolition and remediation of Toshiba Australia warehousing and office facilities in Parramatta including car parking and landscaped areas in preparation for residential redevelopment of the site.

READ MORE
 image

Theodore Barcham Asbestos ...

Liberty Industrial carried out the remediation of an 80,000m3 asbestos contaminated site proposed for a new road alignment within Northshore Hamilton Precinct 4B as part of the Northshore Hamilton Urban Development Project; a large waterfront urban renewal project in Brisbane, Queensland.

READ MORE
 image

7 Neil Street Remediation

This remediation project involved the excavation, stockpiling and disposal of over 5000 tonnes of asbestos and hydrocarbon impacted soils along with the dewatering, storage and treatment of in excess of 1 million litres of impacted groundwater.

READ MORE
 image

B48 Liquor Burning Stack

Liberty Industrial carried out the dismantling and removal of the B48 Liquor Burning Stack at Alcoa’s facility in Wagerup, Western Australia.

READ MORE
 image

Cape Lambert Power Station

The project involved the demolition and removal of the redundant Cape Lambert Power Station for Rio Tinto, including decommissioning and deenergising the station, friable asbestos removal of boilers, demolition of the boilers, boiler stacks, and removal of all structures to top of ground slabs.

READ MORE
 image

Boodarie Site Cleanup

Liberty Industrial stepped in as the main demolition contractor to assist BHP Billiton Iron Ore after another contractor’s contract was rescinded due to non compliance. Liberty Industrial completed the clean-up works to the satisfaction of BHP Billiton in preparation for the future HBI facility demolition project.

READ MORE
 image

Nelson Point Stacker Recla...

Liberty Industrial was commissioned to demolish and remove a redundant stacker, tripper and Reclaimer 3 at the Nelson Point facility. The task also included the demolition of conveyors, transfer towers, rail lines, and all footings and cyclone tie downs.

READ MORE
 image

Nova Nickel Village

Liberty Industrial was engaged by Kerman to undertake earthworks and civil works for the construction accommodation facilities at Sirius Resources Nova nickel project.

READ MORE
 image

Beneficiation Plant

Liberty Industrial was engaged by BHP Billiton Iron Ore to safely demolish and remove the complex and challenging Beneficiation Plant at Boodarie, Western Australia.

READ MORE
 image

Olympic Dam Bypass Stack

Liberty Industrial was sole sourced for the deconstruction of a failed stack standing within an operating Acid Plant at Olympic Dam mining facility. We were selected on the strength of our reputation as an industrial demolition specialist.

READ MORE
 image

Awaba Colliery

Liberty Industrial was retained to deconstruct and demolish redundant infrastructure at Centennial Coal’s Awaba Colliery in Awaba, NSW.

READ MORE
 image

Nickel West Borsigs Area

Liberty Industrial was chosen to perform a complex demolition and asbestos removal process within an operating facility under extremely stringent conditions and to the highest BHP Billiton safety standards.

READ MORE
 image

Former DNSDC Refuelling Ar...

The Defence National Storage and Distribution Centre (DNSDC) Refuelling Area Remediation involved the demolition of existing superstructure such as buildings and canopy and the removal of all existing Underground Petroleum Storage System infrastructure

READ MORE
 image

Middle Robe

Liberty Industrial was engaged by Rio Tinto Iron Ore to conduct demolition and rehabilitation works in various locations across 35km of a non operational mine known as Deepdale in Pannawonica, situated 200km South West of Karratha, in Western Australia.

READ MORE
 image

Northern Link Camp

The project involved the demolition and rehabilitation of a 300 person iron ore mine camp located in the Pilbara region, including the demobilisation and dismantling of nominated accommodation units and buildings for transport and shipping to another mine camp.

READ MORE
 image

Clyde Refinery Remediation

Liberty Industrial was engaged to remediate approximately 200 tonnes of heavily impacted bitumen contaminated soil at VIVA Energy’s Clyde facility. Bioremediation was chosen as the treatment method, as it was determined to be the most cost effective and sustainable option.

READ MORE
 image

Bayswater Power Station US...

The project involved the decommissioning of two 20,000 litre and one 30,000 litre Underground Storage Tank at the Bayswater Power Station site in Muswellbrook, NSW. The works were carried out in accordance with the NSW EPA Underground Petroleum Storage Systems Regulation 2014.

READ MORE
 image

Caltex Mareeba Depot

This project involved the demolition and remediation of the former Caltex Depot at Mareeba including the removal of five above storage tanks, the demolition of the amenities, drum store and tanker refuelling gantry.

READ MORE
 image

Newcastle Terminal Demolit...

Liberty Industrial were engaged by Viva Energy on a single source agreement to demolish the former Shell fuel terminal in Hamilton NSW down to grade level and remove all assets from site.

READ MORE
 image

Ballina Asbestos Gravel Re...

Liberty Industrial was engaged by Ballina Shire Council to remediate asbestos contamination at their Waste Management Facility.

READ MORE
 image

Caltex Hamilton Service St...

The project involved the complete site demolition and remediation of a former Caltex Service Station in Hamilton, Queensland. The demolition works includes asbestos removal from the amenities building and asbestos pipework. The demolition also included removal of all hardstand concrete from across the site.

READ MORE
 image

Blackwater Coal Stacker De...

Liberty Industrial carried out the demolition of a collapsed coal stacker at BMA’s Thermal Coal Plant in Blackwater, Queensland. The coal stacker had collapsed during a high wind event and was now hindering BMA’s usual coal export operations.

READ MORE
 image

Tomago Treatment Plant Dem...

The Hunter Water project involved hazardous material removal and demolition of a former Water Treatment Plant at Tomago NSW. The large above concrete structure contained over 3000 tonnes of concrete and brick that required the use of large scale concrete shear attachment due to the heavy reinforcing steel present.

READ MORE
 image

Rozelle Rail Yard Demoliti...

Liberty Industrial carried out the demolition of the Rozelle Rail Yards Project in Rozelle, NSW. Works formed part of the early works package associated with the development of the site as the Rozelle civil and tunnel site for the WestConnex (M4-M5 Link) Project.

READ MORE
 image

Munmorah Power Station Wat...

Liberty Industrial is carrying out the removal of Munmorah Power Station, a 1400 megawatt coal fired power station including four 350 megawatt steam driven turbo-alternators, two 155 metre high chimney stacks, boiler house, coal handling plant and conveyors and 2.3km of ash lines.

READ MORE
 image

Former Camden Gasworks Rem...

Liberty Industrial were contracted to conduct remediation works enabling the future redevelopment of the former Camden High School site located in Camden, NSW.

READ MORE
 image

Jordan Springs East Site R...

The project involved the removal of identified contaminated soils from site to an offsite disposal location and the stockpiling of useable, non-contaminated material to specific locations on site to assist Lend Lease in subsequent land development packages.

READ MORE
 image

Demolition & Remediation o...

Liberty Industrial has been engaged by NSW Public Works Advisory to undertake demolition and remediation of 12 Loose Fill Asbestos Insulation affected residential properties located in Holbrook, Narrandera and Albury.

READ MORE
 image

Bunbury Outer Harbour Site...

The demolition of redundant infrastructure at Iluka Resources mineral sands storage facility located at Bunbury Outer Harbour in Western Australia.

READ MORE
 image

Macquarie Coal Preparation...

Liberty Industrial have been engaged to undertake the demolition and removal of the Macquarie Coal Preparation Plant in the Lake Macquarie Region. The project is the second stage of works undertaken by Liberty Industrial.

READ MORE
 image

Precinct East Demolition a...

This stage of the Moorebank Intermodal Terminal project was awarded to Liberty as variation to the IMEX contract and was a strong signal from the client of our work to date.